Smith Road Raceway PR Addict May 9, 2018 #1 Due to delays with the pipeline Smith Road will be canceling our annual Memorial Day race
Justin.S_57 Noob May 24, 2018 #2 About how much time is left until the pipeline will be done? With no hurry at all just normal work days
About how much time is left until the pipeline will be done? With no hurry at all just normal work days
Smith Road Raceway PR Addict Jun 1, 2018 #3 Well they were almost done but they installed part of it above grade so they have to rip it out and reninstall (the section not the whole thing) so we are still a few weeks out
Well they were almost done but they installed part of it above grade so they have to rip it out and reninstall (the section not the whole thing) so we are still a few weeks out